Asbestos management plans
Set out who manages asbestos at each site and what they need to do.
The survey, register and plan work together
The asbestos survey provides evidence about the materials inspected and its findings inform the asbestos register. The management plan is the practical companion: it explains who is responsible, how the information is used, how the condition of identified or presumed materials is monitored, and how employees and contractors receive the information they need. Keep the plan with the current register and relevant site drawings so the arrangements can be followed at the premises.
Review the plan at least every 12 months
HSE guidance says to review the asbestos management plan every 12 months, or sooner if necessary. The review should check that responsibilities, procedures, the asbestos register and site drawings are still accurate and that the plan is being put into practice.
Read HSE guidance on reviewing the plan →Review sooner when something changes
Do not wait for the annual review if a significant change affects the premises or how asbestos is managed. Review and update the plan without delay after relevant survey findings, damage or disturbance to an asbestos-containing material, removal work, refurbishment, a change in the use of an area, or a change in the people or procedures responsible for managing the risk. Record what changed and communicate it to those who need the information.
Read Regulation 4 of the Control of Asbestos Regulations 2012 →Set condition checks to suit the materials
The annual plan review is different from checking the condition of asbestos-containing materials. The plan should set out who carries out those checks and how often, taking account of the material, its condition, location, likelihood of disturbance and the findings of previous inspections. Update the register and plan when a check identifies a change.
Make the review actionable
A useful review confirms named responsibilities, overdue actions, monitoring dates, staff and contractor communication, and where the latest records can be found. It should leave the dutyholder with clear actions, owners and target dates.
Explore portfolio compliance support →Related services
Explore asbestos management support for commercial properties and estates.
Explore portfolio compliance →Common questions
How often should an asbestos management plan be reviewed?
HSE guidance says to review the plan every 12 months, or sooner if necessary. Review it without delay when significant changes mean it may no longer reflect the premises or the way asbestos is managed.
Is the management plan the same as the asbestos register?
No. The register and site plan record where asbestos is known or presumed to be and its condition. The management plan sets out who does what, how materials are monitored and how information is shared.
Does the annual plan review set the condition-check interval?
No. The plan review and checks of material condition are separate. The plan should state a site-specific check frequency based on the materials and circumstances.
Who should receive asbestos information?
Relevant site managers, employees, maintenance workers and contractors should receive the information and arrangements they need before work that could disturb asbestos.